Instrumentation

in the East Area Beam Lines



SE61-extraction
Screen in septum 57 tank PR.MTV57
SEM grid in septum 57 tank (TopoScope) PR.MSG57

F61-line
Spill shape measurement (light sensitive device) F61.MLSD
First screen after extraction F61.MTV01
Screen before splitter magnet F61.MTV02
Screen after splitter magnet F61.MTV03

F61D-line (test beam / dump)
Screen before beam dump F61D.MTV01

F61N-line
First screen in the north branch F61N.MTV01
Secondary emmision counter F61N.MSC01
Target station for the north branch F61N.MTV02
Beam telescope above target F61N.MTEL01

F61S-line
First screen in the south branch before T7, T8 separation F61S.MTV01

ZT7-line
Secondary emmision counter ZT7.MSC01
First screen and target station for the T7 beam line ZT7.MTV01
Beam telescope above target ZT7.MTEL01
Irradiations screen for 'table' irradiations ZT7.MTV02
Last screen to verfy irradiation beam ZT7.MTV03
Multiple Wire Proportion Chambers  

ZT8-line
First screen in the Dirac beam line ZT8.MTV01
Secondary emmision counter before target ZT8.MSC01
Target station for the DIRAC experiment ZT8.MTV02
Secondary electron emmision device ZT8.SEED
Beam telescope above target ZT8.MTEL01
Screen behind the Dirac experiment ZT8.MTV03
Secondary emmision counter behind experiment ZT8.MSC02

ZT9-line
     
     
Multiple Wire Proportion Chambers  

ZT10-line
Multiple Wire Proportion Chambers  

ZT11-line
     
Multiple Wire Proportion Chambers  


Last updated: 18 September 2001 By : Rende Steerenberg