1. - Introduction to the East Area

 
1.1 Where is the East Area?

Please click on the image for a full size view

 

 
1.2 The East Area from above.

Please click on the image for a full size view

Please click on the image for a full size view

 

 
1.3 The experiments.

 

 

 
1.4 The secondary beams.

Please click on the image for a full size view

Please click on the image for a full size view

Please click on the image for a full size view

 

 
1.5 The collimators in the secondary beam lines.

Please click on the image for a full size view

 

 
1.5 East Area key words.

A few keywords about East Area Operation
Keywords Description

SE 61

Slow extraction of the beam from straight section 61 in the P.S. machine
Beam Lines

F61

Transfer channel, from PS extraction septum magnet SMH61 (excluded) to the 2nd beam stopper F61.STP02 after the splitter SMH01 (included)

F61N

Transfer channel, from end of F61 to the north branch target station (included)

F61S

Transfer channel, from end of F61 to F61S.BHZ02 (included), last horizontal bending before south branch target station

ZT7

Transfer channel, from end of FE61S to LHC B (T7) reference focus

ZT8

Transfer channel, from end of FE61S to DIRAC (T8) reference focus

ZT9

Transfer channel, from end of FE61N to ATLAS/CMS (T9) reference focus

ZT10

Transfer channel, from end of FE61N to ALICE (T10) reference focus

ZT11

Transfer channel, from end of FE61N to (T11) reference focus
Areas

T7

Area housing beam line ZT7 and the LHCB test place

T8

Area housing beam line ZT8 and the DIRAC experiment

T9

Area housing beam line ZT9 and the ATLAS/CMS test place

T10

Area housing beam line ZT10 and the ALICE test place

T11

Area housing beam line ZT11 and a general purpose test place.
Access

Access to any of the areas T7c, T8c, T9c, T10c and T11c does not prevent beam from going to other areas.

Access to any of the area T7a, T8a, T9a, T10a and T11a prevents beam from leaving the PS ring area.

 

A few keywords about Pulse to Pulse Modulation (PPM) for the East Area Operation
Keywords Description
Users

EASTA

PS cycle, mainly used for T7, T9, T10, T11

EASTB

PS cycle, mainly used for T8 (DIRAC)

EASTC

PS cycle, combined operation TOF / T7, T9, T10, T11
Beam Lines

DN0

All beam to the north branch, within splitter gap, splitter off

DN1

All beam to the north branch, outside splitter gap, splitter on (or off)

DS7

All beam to the south branch (to T7)

DS8

All beam to the south branch (to T8)

DNS7

Beam shared between north and south branch T7

DNS8

Beam shared between north and south branch T8
PPM features of Magnetic elements

Non PPM

The power supply pulses with the same value for all cycles and / or destination

Partial PPM

The power supply can pulse with a different value from one cycle and / or destination to the other but they should not be consequetive.

Full PPM

The power supply can pulse with a different value from one cycle and or destination to the other.

 

 
1.6 Contributors.

 

Last updated: 3 May 20000 By: Rende Steerenberg